A major new production facility will be built on land leased from the Szczecin-Swinoujscie Port Authority on Ostrow Grabowski. Operations are scheduled to begin in the first half of 2026.
The investor is Windar-an entity operating in the renewable energy sector, with production facilities around the world. It is in Szczecin that the first Polish factory, producing the latest generation of offshore wind towers, is scheduled to open.
This is very good news for Szczecin and its residents. In addition to the estimated at least 450 new jobs, equally important is all the infrastructure that will have to be built to ensure conditions for the giant’s smooth operation. Such an investment strengthens the local economy.
Thanks to such investments, the West Pomeranian region is becoming a strategic center for wind energy exploitation in the Baltic Sea. As Szczecin Mayor Piotr Krzystek says, business develops where there are sources of energy – that’s why this investment is so strategically important for Szczecin.
More information:
https://wiadomosci.szczecin.eu/artykul/biznes/w-szczecinie-powstanie-kolejny-duzy-zaklad-produkcyjny